2019
|
1. |
Mejlænder-Larsen, Øystein. A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering Construction and Architectural Management 2019 ;Volum 26.(4) s. 648-667 NTNU
Untitled
|
2018
|
2. |
Mejlænder-Larsen, Øystein. Improving collaboration between engineering and construction in detail engineering using a project execution model and BIM. Journal of Information Technology in Construction (ITcon) 2018 ;Volum 23. s. 324-339 NTNU
Untitled
|
2017
|
3. |
Meistad, Torill; Støre-Valen, Marit; Knotten, Vegard; Hosseini, Ali; Klakegg, Ole Jonny; Mejlænder-Larsen, Øystein; Hjelseth, Eilif; Svalestuen, Fredrik; Lædre, Ola; Hansen, Geir Karsten; Lohne, Jardar. Stakeholder perspectives and information exchange in AEC projects. I: Integrating information in built environments - from concept to practice. Routledge 2017 ISBN 9781138706323. s. 194-209 OSLOMET NTNU
Untitled
|
|
4. |
Mejlænder-Larsen, Øystein. Using a change control system and building information modelling to manage change in design. Architectural Engineering and Design Management 2017 ;Volum 13.(1) s. 39-51 NTNU
Untitled
|
2016
|
5. |
Mejlænder-Larsen, Øystein. Collaboration and BIM Supportive Project Execution Model for the Construction Industry. 41st IAHS World Congress; 2016-09-13 - 2016-09-16 NTNU
Untitled
|
|
6. |
Mejlænder-Larsen, Øystein. Improving Transition from Engineering to Construction Using a Project Execution Model and BIM. Raportti (Tampereen teknillinen yliopisto. Rakennustuotanto ja -talous) 2016 ;Volum 1. s. 540-551 NTNU
Untitled
|
|
7. |
Mejlænder-Larsen, Øystein. Improving Transition from Engineering to Construction Using a Project Execution Model and Building Information Model. CIB World Building Congress 2016; 2016-05-30 - 2016-06-03 NTNU
Untitled
|
2015
|
8. |
Mejlænder-Larsen, Øystein. Generalising via the Case Studies and Adapting the Oil and Gas Industry's Project Execution Concepts to the Construction Industry. Procedia Economics and Finance 2015 ;Volum 21. s. 271-278 NTNU
Untitled
|
|
9. |
Mejlænder-Larsen, Øystein. Generalising via the Case Studies and Adapting the Oil and Gas Industry's Project Execution Concepts to the Construction Industry. 8th Nordic Conference on Construction Economics and Organization; 2015-05-28 - 2015-05-29 NTNU
Untitled
|
|
10. |
Mejlænder-Larsen, Øystein. Using a change control system and BIM to manage change requests in Design. 32nd CIB W78 Conference 2015; 2015-10-27 - 2015-10-29 NTNU
Untitled
|
|
11. |
Mejlænder-Larsen, Øystein. Using BIM To Follow Up Milestones In A Project Plan During The Design Phase. WIT Transactions on the Built Environment 2015 ;Volum 149. s. 97-106 NTNU
Untitled
|
|
12. |
Mejlænder-Larsen, Øystein. Using BIM To Follow Up Milestones In A Project Plan During The Design Phase. International Conference on Building Information Modelling (BIM) in Design, Construction and Operations; 2015-09-09 - 2015-09-11 NTNU
Untitled
|