2013
|
1. |
Pettersson, Annelie I.; Segerstedt, Anders. Measuring supply chain cost. International Journal of Production Economics 2013 ;Volum 143.(2) s. 357-363 UiT
Untitled
|
2012
|
2. |
Zanoni, Simone; Segerstedt, Anders; Tang, Ou; Mazzoldi, Laura. Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy. Computers & industrial engineering 2012 ;Volum 62.(4) s. 1025-1033 UiT
Untitled
|
2011
|
3. |
Pettersson, Annelie I.; Segerstedt, Anders. Performance measurement in supply chain within Swedish industry. International Journal of Logistics Systems and Management 2011 ;Volum 9.(1) s. 69-88 UiT
Untitled
|
2010
|
4. |
Abdul-Jalbar, Beatriz; Segerstedt, Anders; Sicilia, Joaquin; Nilsson, Andreas. A new heuristic to solve the one-warehouse N-retailer problem. Computers & Operations Research 2010 ;Volum 37.(2) s. 265-272 UiT
Untitled
|
|
5. |
Pettersen, Jan-Arne; Segerstedt, Anders; Bang, Børre. Three-dimensional performance surfaces-a tool for analysing and estimation of production system performances. International Journal of Production Research 2010 ;Volum 48.(17) s. 4937-4948 UiT
Untitled
|
|
6. |
Segerstedt, Anders; Olofsson, Thomas. Supply chains in the construction industry. Supply chain management 2010 ;Volum 15.(5) s. 347-353 UiT
Untitled
|
|
7. |
Wallstrøm, Peter; Segerstedt, Anders. Evaluation of forecasting error measurements and techniques for intermittent demand. International Journal of Production Economics 2010 ;Volum 128.(2) s. 625-636 UiT
Untitled
|
2009
|
8. |
Brander, Pär; Segerstedt, Anders. Economic lot scheduling problems incorporating a cost of using the production facility. International Journal of Production Research 2009 ;Volum 47.(13) s. 3611-3624 UiT
Untitled
|
|
9. |
Pettersen, Jan-Arne; Segerstedt, Anders. Restricted work-in-process: A study of differences between Kanban and CONWIP. International Journal of Production Economics 2009 ;Volum 118.(1) s. 199-207 UiT
Untitled
|
2008
|
10. |
Nilsson, Kristina; Segerstedt, Anders. Corrections of costs to feasible solutions of economic lot scheduling problems. Computers & industrial engineering 2008 ;Volum 54.(1) s. 155-168 UiT
Untitled
|
|
11. |
Segerstedt, Anders. Logistik med fokus på material- och produktionsstyrning. Liber 2008 (ISBN 9789147089000) 288 s. HIN
Untitled
|
2007
|
12. |
Pettersen, Jan-Arne; Segerstedt, Anders. Restricted work-in-progress, a study of differences between Kanban and CONWIP. I: IESM 2007, International Conference on Industrial Engineering and Systems Management, May 30 - June 2, 2007, Beijing - China. Mons, France: International Institute for Innovation, Industrial Engineering and Ent 2007 s. 16- UiT
Untitled
|
|
13. |
Segerstedt, Anders. Cover-time planning, an alternative to material requirements planning; with customer order production abilities and restricted work-in-progress. I: IESM 2007, International Conference on Industrial Engineering and Systems Management, May 30 - June 2, 2007, Beijing - China. Mons, France: International Institute for Innovation, Industrial Engineering and Ent 2007 s. 6- UiT
Untitled
|
2006
|
14. |
Segerstedt, Anders. Master production scheduling and a comparison of material requirements planning and cover-time planning. International Journal of Production Research 2006 ;Volum 44.(18) s. 3585-3606 UiT
Untitled
|
2005
|
15. |
Brander, Pär; Levén, Erik; Segerstedt, Anders. Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand. International Journal of Production Economics 2005 ;Volum 93-94. s. 375-386
Untitled
|
|
16. |
Kilpala, Heli; Solvang, Wei Deng; Segerstedt, Anders; Widmark, Jenny; Bagaeva, Alexandra; Tuohinto, Paula. Analysis of ICT use in the Barents region: research findings from logistics service providers and forest industry. Oulo, Finland: STBR - Sustainable Transport in the Barents Region, Interreg IIIB 2005 (ISBN 9525549186) 48 s. (nov.05) HIN
Untitled
|
|
17. |
Ljunggren, Per Åge; Segerstedt, Anders. Produksjon mot kundeordrer og styring av produkter i arbeid. Logistikk & Ledelse 2005 (10) s. 24-26 UiT
Untitled
|
|
18. |
Segerstedt, Anders. Flytta produktion till lågkostnadsländer kan vara osäker strategi. Inköp & logistik 2005 (4) s. 26- UiT
Untitled
|
|
19. |
Segerstedt, Anders. Godstransportdelagationen saknar analys. Transport iDag/iTrafik 2005 (5) s. 12- UiT
Untitled
|
|
20. |
Segerstedt, Anders. Master production scheduling and a comparison of material requirements planning and cover-time planning. I: Proceedings 18th International Conference on Production Research, University of Salerno, July 31-August 4, 2005 (CD-ROM). Salerno. Italy: University of Salerno 2005 s. -
Untitled
|
|
21. |
Segerstedt, Anders. Täcktidsplanering : underlättar kundorderstyrd produktion och kontroll av produkter i arbete. Bättre produktivitet 2005 (3) s. 20-22 UiT
Untitled
|
|
22. |
Segerstedt, Anders; Nordmark, Robert. Cover-time planning, an alternative to material requirements planning; with comments on customer driven production and control of work in process. 18th Scandinavian Academy of Management Meeting; 2005-08-18 - 2005-08-20
Untitled
|
2004
|
23. |
Hageback, Charlotte; Segerstedt, Anders. The need for co-distribution in rural areas : a study of Pajala in Sweden. International Journal of Production Economics 2004 ;Volum 89(2004). s. 153-163
Untitled
|
|
24. |
Levén, Erik; Segerstedt, Anders. Inventory control with a modified Croston procedure and Erlang distribution. International Journal of Production Economics 2004 ;Volum 90(2004). s. 361-367
Untitled
|
|
25. |
Levén, Erik; Segerstedt, Anders. Polarica's wild berries : an example of a required storage capacity calculation and where to locate this inventory. Supply chain management 2004 ;Volum 9(2004).(3) s. 213-218
Untitled
|
|
26. |
Segerstedt, Anders. Frequency approach for treating capacity-constrained multilevel production. International Journal of Production Research 2004 ;Volum 42(2004).(16) s. 3119-3137
Untitled
|