Current Research Information SysTem In Norway
 
 

 English version


 
Hovedside
Forskningsresultater/NVI
Forskere
Prosjekter
Forskningsenheter
Logg inn
Om Cristin
 
 
   
Eksporter til


Viser treff 1-26 av 26

2013
1 Pettersson, Annelie I.; Segerstedt, Anders.
Measuring supply chain cost. International Journal of Production Economics 2013 ;Volum 143.(2) s. 357-363
UiT Untitled
 
2012
2 Zanoni, Simone; Segerstedt, Anders; Tang, Ou; Mazzoldi, Laura.
Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy. Computers & industrial engineering 2012 ;Volum 62.(4) s. 1025-1033
UiT Untitled
 
2011
3 Pettersson, Annelie I.; Segerstedt, Anders.
Performance measurement in supply chain within Swedish industry. International Journal of Logistics Systems and Management 2011 ;Volum 9.(1) s. 69-88
UiT Untitled
 
2010
4 Abdul-Jalbar, Beatriz; Segerstedt, Anders; Sicilia, Joaquin; Nilsson, Andreas.
A new heuristic to solve the one-warehouse N-retailer problem. Computers & Operations Research 2010 ;Volum 37.(2) s. 265-272
UiT Untitled
 
5 Pettersen, Jan-Arne; Segerstedt, Anders; Bang, Børre.
Three-dimensional performance surfaces-a tool for analysing and estimation of production system performances. International Journal of Production Research 2010 ;Volum 48.(17) s. 4937-4948
UiT Untitled
 
6 Segerstedt, Anders; Olofsson, Thomas.
Supply chains in the construction industry. Supply chain management 2010 ;Volum 15.(5) s. 347-353
UiT Untitled
 
7 Wallstrøm, Peter; Segerstedt, Anders.
Evaluation of forecasting error measurements and techniques for intermittent demand. International Journal of Production Economics 2010 ;Volum 128.(2) s. 625-636
UiT Untitled
 
2009
8 Brander, Pär; Segerstedt, Anders.
Economic lot scheduling problems incorporating a cost of using the production facility. International Journal of Production Research 2009 ;Volum 47.(13) s. 3611-3624
UiT Untitled
 
9 Pettersen, Jan-Arne; Segerstedt, Anders.
Restricted work-in-process: A study of differences between Kanban and CONWIP. International Journal of Production Economics 2009 ;Volum 118.(1) s. 199-207
UiT Untitled
 
2008
10 Nilsson, Kristina; Segerstedt, Anders.
Corrections of costs to feasible solutions of economic lot scheduling problems. Computers & industrial engineering 2008 ;Volum 54.(1) s. 155-168
UiT Untitled
 
11 Segerstedt, Anders.
Logistik med fokus på material- och produktionsstyrning. Liber 2008 (ISBN 9789147089000) 288 s.
HIN Untitled
 
2007
12 Pettersen, Jan-Arne; Segerstedt, Anders.
Restricted work-in-progress, a study of differences between Kanban and CONWIP. I: IESM 2007, International Conference on Industrial Engineering and Systems Management, May 30 - June 2, 2007, Beijing - China. Mons, France: International Institute for Innovation, Industrial Engineering and Ent 2007 s. 16-
UiT Untitled
 
13 Segerstedt, Anders.
Cover-time planning, an alternative to material requirements planning; with customer order production abilities and restricted work-in-progress. I: IESM 2007, International Conference on Industrial Engineering and Systems Management, May 30 - June 2, 2007, Beijing - China. Mons, France: International Institute for Innovation, Industrial Engineering and Ent 2007 s. 6-
UiT Untitled
 
2006
14 Segerstedt, Anders.
Master production scheduling and a comparison of material requirements planning and cover-time planning. International Journal of Production Research 2006 ;Volum 44.(18) s. 3585-3606
UiT Untitled
 
2005
15 Brander, Pär; Levén, Erik; Segerstedt, Anders.
Lot sizes in a capacity constrained facility - a simulation study of stationary stochastic demand. International Journal of Production Economics 2005 ;Volum 93-94. s. 375-386
Untitled
 
16 Kilpala, Heli; Solvang, Wei Deng; Segerstedt, Anders; Widmark, Jenny; Bagaeva, Alexandra; Tuohinto, Paula.
Analysis of ICT use in the Barents region: research findings from logistics service providers and forest industry. Oulo, Finland: STBR - Sustainable Transport in the Barents Region, Interreg IIIB 2005 (ISBN 9525549186) 48 s. (nov.05)
HIN Untitled
 
17 Ljunggren, Per Åge; Segerstedt, Anders.
Produksjon mot kundeordrer og styring av produkter i arbeid. Logistikk & Ledelse 2005 (10) s. 24-26
UiT Untitled
 
18 Segerstedt, Anders.
Flytta produktion till lågkostnadsländer kan vara osäker strategi. Inköp & logistik 2005 (4) s. 26-
UiT Untitled
 
19 Segerstedt, Anders.
Godstransportdelagationen saknar analys. Transport iDag/iTrafik 2005 (5) s. 12-
UiT Untitled
 
20 Segerstedt, Anders.
Master production scheduling and a comparison of material requirements planning and cover-time planning. I: Proceedings 18th International Conference on Production Research, University of Salerno, July 31-August 4, 2005 (CD-ROM). Salerno. Italy: University of Salerno 2005 s. -
Untitled
 
21 Segerstedt, Anders.
Täcktidsplanering : underlättar kundorderstyrd produktion och kontroll av produkter i arbete. Bättre produktivitet 2005 (3) s. 20-22
UiT Untitled
 
22 Segerstedt, Anders; Nordmark, Robert.
Cover-time planning, an alternative to material requirements planning; with comments on customer driven production and control of work in process. 18th Scandinavian Academy of Management Meeting; 2005-08-18 - 2005-08-20
Untitled
 
2004
23 Hageback, Charlotte; Segerstedt, Anders.
The need for co-distribution in rural areas : a study of Pajala in Sweden. International Journal of Production Economics 2004 ;Volum 89(2004). s. 153-163
Untitled
 
24 Levén, Erik; Segerstedt, Anders.
Inventory control with a modified Croston procedure and Erlang distribution. International Journal of Production Economics 2004 ;Volum 90(2004). s. 361-367
Untitled
 
25 Levén, Erik; Segerstedt, Anders.
Polarica's wild berries : an example of a required storage capacity calculation and where to locate this inventory. Supply chain management 2004 ;Volum 9(2004).(3) s. 213-218
Untitled
 
26 Segerstedt, Anders.
Frequency approach for treating capacity-constrained multilevel production. International Journal of Production Research 2004 ;Volum 42(2004).(16) s. 3119-3137
Untitled