2021
|
1. |
Neupane, Bibek. Long-term impact on unlined tunnels of hydropower projects due to frequent start stop sequences.
Untitled
|
|
2. |
Neupane, Bibek; Panthi, Krishna Kanta. Evaluation on the Efect of Pressure Transients on Rock Joints in Unlined Hydropower Tunnels Using Numerical Simulation. Rock Mechanics and Rock Engineering 2021 ;Volum 54. s. 2975-2994 NTNU
Untitled
|
|
3. |
Neupane, Bibek; Panthi, Krishna Kanta; Vereide, Kaspar. Cyclic fatigue in unlined hydro tunnels caused by pressure transients. International journal on hydropower and dams 2021 ;Volum 2021.(Issue 5) s. 46-54 NTNU
Untitled
|
|
4. |
Neupane, Bibek; Panthi, Krishna Kanta; Vereide, Kaspar. Long-term impact on unlined tunnels of hydropower plants due to frequent start/stop sequences. Trondheim: NTNU 2021 (ISBN 978-82-326-5384-3) 143 s. Doctoral theses at NTNU(Doctoral theses at NTNU, 2021:400) NTNU
Untitled
|
|
5. |
Neupane, Bibek; Vereide, Kaspar; Panthi, Krishna Kanta. Operation of Norwegian Hydropower Plants and Its Effect on Block Fall Events in Unlined Pressure Tunnels and Shafts. Water 2021 ;Volum 13.(11) s. - NTNU
Untitled
|
2020
|
6. |
Neupane, Bibek; Panthi, Krishna Kanta. Numerical simulation of pore pressure in rock joints during pressure transient in an unlined hydropower tunnel. I: ISRM International Symposium - EUROCK 2020. Online: https://www.onepetro.org/conferences/ISRM/EUROCK20: International Society for Rock Mechanics and Rock Engineering 2020 ISBN 9788282080729. s. 1-10 NTNU
Untitled
|
|
7. |
Neupane, Bibek; Panthi, Krishna Kanta; Vereide, Kaspar. Effect of power plant operation on pore pressure in jointed rock mass of an unlined hydropower tunnel: An experimental study. Rock Mechanics and Rock Engineering 2020 ;Volum 53.(Issue 7) s. 3073-3092 NTNU
Untitled
|
2019
|
8. |
Neupane, Bibek; Panthi, Krishna Kanta. Effect of pressure fluctuations in long-term stability of unlined pressure shaft at Svandalsflona Hydropower project, Norway. I: ARMS10 10th Asian Rock Mechanics Symposium The ISRM International Symposium for 2018, 29 Oct - 3 Nov, Singapore - proceedings. : International Society for Rock Mechanics 2019 ISBN 978-981-11-9003-2. s. 1-11 NTNU
Untitled
|
|
9. |
Neupane, Bibek; Panthi, Krishna Kanta; Vereide, Kaspar. INSTRUMENTATION AND PORE PRESSURE MONITORING TECHNIQUE FOR UNLINED TUNNELS OF NORWEGIAN HYDROPOWER PROJECTS – A CASE STUDY. I: FJELLSPRENGNINGSTEKNIKK-BERGMEKANIKK-GEOTEKNIKK. Oslo: Norsk forening for fjellsprengningsteknikk, Norsk Bergmekanikkgruppe og Norsk Geoteknisk Forening 2019 ISBN 978-82-8208-070-5. s. 23.1-23.10 NTNU
Untitled
|
|
10. |
Neupane, Bibek; Panthi, Krishna Kanta; Vereide, Kaspar. Method for monitoring of pore pressure in jointed rock mass of an unlined headrace tunnel subjected to varying power plant operation: A case study. I: Rock Mechanics for Natural Resources and Infrastructure Development. CRC Press 2019 ISBN 978-0-367-42284-4. s. 1303-1310 NTNU
Untitled
|
2018
|
11. |
Neupane, Bibek; Panthi, Krishna Kanta. Effect of pressure fluctuations in long-term stability of unlined pressure shaft at Svandalsflona Hydropower project, Norway. ARMS10 10th Asian Rock Mechanics Symposium, The ISRM International Symposium for 2018; 2018-10-29 - 2018-11-03 NTNU
Untitled
|
2012
|
12. |
Neupane, Bibek; Panthi, Krishna Kanta. Assessment on potential Hydraulic Fracturing at Upper Tamakoshi High Pressure Tunnel in Nepal Himalaya. I: Tunnelling and Underground Space for a Global Society; World Tunnel Congress 2012; Proceedings. Bangkok, Thailand: Engineering Institute of Thailand (EIT) / ITA 2012 ISBN 978-974-7197-78-5. NTNU
Untitled
|
|
13. |
Neupane, Bibek; Panthi, Krishna Kanta. Assessment on potential hydraulic fracturing at Upper Tamakoshi High Pressure Tunnel in Nepal Himalaya. World Tunnel Congress 2012; 2012-05-21 - 2012-05-23 NTNU
Untitled
|
|
14. |
Neupane, Bibek; Panthi, Krishna Kanta. Evaluation on the Potential Use of Shotcrete Lined High Pressure Tunnel at Upper Tamakoshi Hydroelectric Project. Hydro Nepal: Journal of Water, Energy and Environment 2012 (10) s. 73-80 NTNU
Untitled
|